Barrie does not have one stormwater by-law for a house. Three City by-laws decide where your basement drainage may go. The Property Standards By-law keeps sump and downspout water off the street, the sidewalk and your neighbour’s lot. The Sewer Use By-law keeps it out of the storm sewer unless the City approves the connection in writing. By-law 90-92 stops anyone from blocking or rerouting a ditch or creek. Where the outlet may land on your own lot is the practical question, and a large dig near the lot line now needs a grade plan that shows it.
The sanitary sewer is the other half of the rule, and it is simpler: foundation water may not go there. The permit post on the weeping tile permit fee in Barrie quotes that section in full, so it is not repeated here. This post covers the storm side.
Which by-law answers which question
| Your question | The by-law | Who enforces it |
|---|---|---|
| Where may the sump or downspout water land? | Property Standards By-law 2011-138, sections 7.2 and 7.3 | A Property Standards Officer |
| May the weeping tile join the storm sewer? | Sewer Use By-law 2021-002, sections 4.3 and 4.5 | The City, by permit or agreement |
| May I pipe, fill or reroute the ditch at the back? | Watercourses By-law 90-92 | The City’s Engineering department |
| Does my dig need a grade plan? | The Building By-law, applied through the City’s grading bulletin | Building Services, at the permit |
None of the four is written for waterproofing contractors. Each one lands on a basement job anyway, because the water a drainage system collects has to leave the lot somewhere.
The outlet on your own lot
Section 7.2 of the Property Standards By-law is short. No roof drainage, storm water drainage, sump pump discharge or pool discharge may be “directed or discharged directly onto a sidewalk, street, boulevard, stair or neighbour’s property.” Section 7.3 then sets the standard for where it does go: the yard has to drain so that it prevents “recurrent ponding or the entrance of water into a building,” and in a way that minimizes erosion of the properties next door.
Read the two together and the choices on a typical Barrie lot narrow quickly. The discharge cannot be aimed at the street or the sidewalk, and it cannot point across a narrow side yard at the house next door. In practice that leaves a part of your own yard that slopes away from both houses and does not pond. On a narrow lot, that may be the back yard, which means a longer pipe than the one the old pump had. If the only low spot on the lot sits against your own wall, the outlet is not the fix. The grade is. For the parts of the system, the answer to how does a sump pump work traces the water from the tile to the outlet.
A breach of section 7.2 leads to an order, not straight to a fine. A Property Standards Officer who finds a contravention can issue an order to the owner. The owner has 14 days after being served to appeal it to the Property Standards Committee, and an order that is not appealed is deemed to be confirmed. A person who then fails to comply with a final and binding order is guilty of an offence.
The storm sewer needs the City’s written yes
Burying the discharge and running it to the storm sewer at the street looks tidy. Section 4.3 of the Sewer Use By-law says no person may discharge land drainage or uncontaminated water into the storm sewer “without obtaining an approved permit or agreement which expressly allows the discharge.” Section 4.5 adds that every connection to the storm sewer has to be installed in accordance with the Building Code.
So a storm connection is not a choice a homeowner or a contractor makes on the day. It is a request to the City, and it comes before the trench. A quote that shows a pipe to the road with no mention of that approval has left out the step that decides whether the pipe is allowed.
The swale and the ditch belong to the drainage plan
Where a lot was graded to an approved plan, the shallow swale along the side or rear lot line is part of that plan. The City’s lot grading standard, D703, tells designers that unless the Engineering department approves otherwise, only one sump pump shall discharge per swale. That rule is written for new lots. For an older lot, it is still a sign of how much water the City expects one swale to carry. Pointing a second pump at the same channel, or filling the swale to level a patio, pushes water somewhere the plan did not send it.
A ditch, a creek or a piped drain across the lot is a separate matter, and By-law 90-92 covers it. The owner of the land has to repair and maintain the part that crosses the property. Nobody may “straighten, change, divert or obstruct” one without first filing plans prepared by a Professional Engineer licensed in Ontario, and no work may proceed until Engineering is satisfied it will not obstruct drainage. A watercourse under the by-law reaches 15 metres each side of its centre line, or the floodline area if that is larger.
Enforcement is written into the same by-law. After written notice, the owner has 30 days to fix the problem, and the City may then correct it at the owner’s expense and recover the cost in the same way as municipal taxes. Section 13 sets a fine of up to $5,000 per offence on conviction. A discharge pipe laid through a backyard ditch, or fill that buries one to make room for the pipe, is the sort of change the by-law is written to catch.
When the waterproofing job needs a grade plan
The City’s grading bulletin of July 15, 2026, issued under Building By-law 2026-066, lists the projects that need a grade plan with the permit. One of them is “any project where excavation is required (other than pier footings) and is within 1.2 meters of a property line,” and the bulletin names a foundation as an example.
On a Barrie street where the houses stand close together, an exterior dig along the side wall can come within that distance of the lot line. When it does, the permit needs a plan prepared by a Professional Engineer, a Certified Engineering Technologist, an Ontario Land Surveyor or an Architect. The plan must show existing and proposed grades, the swales with their direction and slope, and the location of any sump pump discharge outlet. That makes the discharge question a drawing on the permit, not a decision on the last day of the job.
If you are pricing exterior waterproofing in Barrie along a side wall, measure from the wall to the lot line before you ask for quotes. Then ask each contractor whether the excavation is inside 1.2 metres, who prepares the grade plan, and whether its cost is in the price.
Five questions to settle before the work starts
- Where will each outlet land, and is that spot on your own lot, clear of the street, the sidewalk and the neighbour’s yard?
- Does the discharge ride an existing swale, and does another pump already use it?
- Is there a ditch, creek or drain on the lot, and is the work within 15 metres of it?
- Does the quote assume a storm sewer connection, and has the City approved one?
- Is the excavation within 1.2 metres of a property line, and who is drawing the grade plan?
A plain redirect to the lawn is also the route the City’s Disconnect to Protect rebate pays for. The amounts and the conditions are on our page for basement waterproofing in Barrie, with the rebate table. If the house needs a new pit because of these rules, see sump pump installation for a Barrie house. When the outlet plan is clear, ask for a basement waterproofing quote in Barrie and tell us where the pump drains today and how far the side wall is from the lot line.